The evaluation on the DERs integration is predicated on preceding types??representation proposed while in the literature. The assumptions regarded for this analysis are as abide by:The common lead time within the frequency control industry is between 8 to 12 months, but it could be longer or shorter. Make sure to Make contact with the maker or supp